Triple
T4136328
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Road To Recovery |
E85163
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transportation assistance program |
C15006
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transportation assistance program Context triple: [Road To Recovery, instanceOf, transportation assistance program]
-
A.
transportation service
A transportation service is a system or business that moves people or goods from one location to another using various modes of transport under defined schedules, routes, and conditions.
-
B.
transportation organization
A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
-
C.
paratransit operator
A paratransit operator is a transportation service provider that offers flexible, demand-responsive rides—often door-to-door—for individuals whose disabilities or mobility limitations prevent them from using standard public transit.
-
D.
transportation services company
A transportation services company is an organization that plans, manages, and operates the movement of people or goods using various modes of transport, such as road, rail, air, or sea, often providing logistics, scheduling, and support services.
-
E.
public transit and highway improvement program
A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed935ccd881909dc61f81bcdb7a78 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:43 p.m.