Triple
T4118013
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | White Knight |
E90340
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-altitude research aircraft |
C14756
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-altitude research aircraft Context triple: [White Knight, instanceOf, high-altitude research aircraft]
-
A.
research aircraft
A research aircraft is a specially equipped airplane or other flying vehicle used to conduct scientific experiments, test new aviation technologies, and gather atmospheric or aerodynamic data.
-
B.
experimental aircraft
An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
-
C.
supersonic aircraft
A supersonic aircraft is a high-speed airplane designed to travel faster than the speed of sound, typically using specialized aerodynamics and powerful jet engines to minimize drag and withstand intense aerodynamic forces.
-
D.
jet-powered aircraft
A jet-powered aircraft is a fixed-wing or VTOL vehicle that generates thrust primarily from one or more jet engines to achieve and sustain flight.
-
E.
rocket-powered aircraft
A rocket-powered aircraft is a type of airplane that uses rocket engines for primary thrust, enabling very high speeds and altitudes over relatively short flight durations.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed95c080881908125e30c5dcdc6f8 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:41 p.m.