Triple
T4114810
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Symphony No. 5 (Harbison) |
E90265
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | contemporary classical composition |
C4311
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: contemporary classical composition Context triple: [Symphony No. 5 (Harbison), instanceOf, contemporary classical composition]
-
A.
orchestral composition
chosen
An orchestral composition is a structured musical work written for performance by an orchestra, organizing multiple instrument families into coordinated parts to create a unified artistic expression.
-
B.
instrumental composition
An instrumental composition is a musical work created specifically for performance by instruments alone, without any vocal parts or lyrics.
-
C.
contemporary musical
A contemporary musical is a modern stage production that combines current musical styles, storytelling techniques, and themes to explore present-day issues and emotions through integrated songs, dialogue, and movement.
-
D.
contemporary music genre
A contemporary music genre is a category of modern music characterized by shared stylistic traits, production techniques, cultural contexts, and audience associations that distinguish it from other forms of music.
-
E.
musical composition collection
A musical composition collection is an organized set of related musical works, grouped together by a unifying theme, creator, period, or purpose for study, performance, or publication.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed95c080881908125e30c5dcdc6f8 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:41 p.m.