Triple

T4097490
Position Surface form Disambiguated ID Type / Status
Subject Ponce de Leon Inlet Lighthouse E87856 entity
Predicate instanceOf P0 FINISHED
Object brick structure C15267 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: brick structure
Context triple: [Ponce de Leon Inlet Lighthouse, instanceOf, brick structure]
  • A. iron-and-glass structure
    An iron-and-glass structure is a building or architectural framework that uses iron elements for support and large expanses of glass for walls or roofing, creating open, light-filled interior spaces.
  • B. interlocking block
    An interlocking block is a modular construction unit designed with complementary shapes or connectors that allow it to securely join with adjacent blocks without the need for additional fasteners or adhesives.
  • C. lattice tower
    A lattice tower is a tall, open-framework structure made of intersecting metal or wooden members, designed to support loads such as antennas, power lines, or observation platforms.
  • D. A-frame structure
    An A-frame structure is a simple, triangular building or framework formed by two sloping sides that meet at the top in the shape of the letter "A," providing strong, stable support with minimal materials.
  • E. masonry dome
    A masonry dome is a curved, self-supporting roof structure constructed from interlocking stone, brick, or concrete units that transfer loads primarily through compression.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed94564cc8190a9c1457daedb6e7f completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:40 p.m.