Triple

T4094109
Position Surface form Disambiguated ID Type / Status
Subject Mathematical Reviews database E87772 entity
Predicate instanceOf P0 FINISHED
Object review database C1031 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: review database
Context triple: [Mathematical Reviews database, instanceOf, review database]
  • A. recension
    A recension is a revised or edited version of a text or document, produced by comparing and correcting different sources or manuscripts.
  • B. bibliographic database chosen
    A bibliographic database is a structured collection of references to published literature, such as books, articles, and reports, organized to support efficient search, retrieval, and management of bibliographic information.
  • C. research index
    A research index is a structured, searchable catalog that organizes and references research materials, data, and sources to enable efficient discovery and retrieval of relevant information.
  • D. research library
    A research library is a specialized institution that collects, organizes, preserves, and provides access to scholarly resources and reference services to support advanced study and original research.
  • E. bibliometric database
    A bibliometric database is a structured collection of publication and citation data used to analyze research output, impact, and scholarly networks.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed94425148190be337845d56fac22 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:40 p.m.