Triple

T409150
Position Surface form Disambiguated ID Type / Status
Subject APEC Ministerial Meeting E9448 entity
Predicate instanceOf P0 FINISHED
Object ministerial meeting C69 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ministerial meeting
Context triple: [APEC Ministerial Meeting, instanceOf, ministerial meeting]
  • A. diplomatic conference chosen
    A diplomatic conference is a formal gathering of representatives from different states or international organizations convened to negotiate agreements, resolve disputes, or discuss issues of mutual concern.
  • B. governing council
    A governing council is a formal body of appointed or elected individuals responsible for making high-level decisions, setting policies, and providing oversight for an organization, community, or institution.
  • C. foreign affairs ministry
    A foreign affairs ministry is a government department responsible for managing a country's international relations, diplomacy, and representation abroad.
  • D. World War II conference
    A World War II conference is a high-level diplomatic meeting held among Allied or Axis leaders during the war to coordinate military strategy, negotiate political arrangements, and shape postwar plans.
  • E. coalition
    A coalition is a temporary or long-term alliance of individuals, groups, or organizations that coordinate their resources and actions to achieve shared goals or exert collective influence.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e80111fc8190961d5b7c6154123f completed Feb. 28, 2026, 1:05 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.