Triple

T4087247
Position Surface form Disambiguated ID Type / Status
Subject Humanities 110 core curriculum E87616 entity
Predicate instanceOf P0 FINISHED
Object core curriculum C15212 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: core curriculum
Context triple: [Humanities 110 core curriculum, instanceOf, core curriculum]
  • A. primary campus
    The primary campus is the main physical location of an educational institution where core academic, administrative, and student life activities are centralized.
  • B. public school
    A public school is a government-funded educational institution that provides free, standardized instruction to students within a designated community or district.
  • C. secondary school
    A secondary school is an educational institution that provides formal learning for adolescents, typically between primary education and higher or vocational education, focusing on a broad curriculum to prepare students for further study or employment.
  • D. academic course
    An academic course is a structured unit of instruction within an educational program, designed with specific learning objectives, content, and assessments over a defined period.
  • E. primary and secondary school
    A primary and secondary school is an educational institution that provides structured, age-appropriate learning and social development for children and adolescents from early childhood through the end of compulsory education.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed94425148190be337845d56fac22 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:39 p.m.