Triple
T4085085
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | R68 subway car |
E87570
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | New York City Subway rolling stock class |
C15202
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: New York City Subway rolling stock class Context triple: [R68 subway car, instanceOf, New York City Subway rolling stock class]
-
A.
New York City Subway service designation
A New York City Subway service designation is a letter, number, or symbol that identifies a specific subway route, indicating its line, terminals, and general service pattern for riders.
-
B.
New York City Subway yard
A New York City Subway yard is a specialized facility where subway trains are stored, inspected, maintained, and dispatched between periods of service.
-
C.
New York City Subway–railroad interchange
A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
-
D.
New York City Subway infrastructure project
A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
-
E.
subway line
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed9435cf48190ad1da737c962d19d |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:39 p.m.