Triple

T4083153
Position Surface form Disambiguated ID Type / Status
Subject Liteyny Bridge E87525 entity
Predicate instanceOf P0 FINISHED
Object bridge in Saint Petersburg C15197 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge in Saint Petersburg
Context triple: [Liteyny Bridge, instanceOf, bridge in Saint Petersburg]
  • A. bridge in New York City
    A bridge in New York City is a large-scale transportation structure spanning waterways or land to connect boroughs and neighborhoods, supporting vehicular, rail, bicycle, and pedestrian traffic within the city’s dense urban environment.
  • B. granite bridge
    A granite bridge is a durable, load-bearing structure constructed primarily from granite blocks or slabs, designed to span physical obstacles such as rivers, roads, or valleys.
  • C. tram bridge
    A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
  • D. Hudson River bridge
    A Hudson River bridge is a large transportation structure spanning the Hudson River to connect communities and facilitate the movement of vehicles, trains, pedestrians, or utilities between its banks.
  • E. bridge in France
    A bridge in France is a constructed structure that spans physical obstacles such as rivers, valleys, or roads within French territory to provide a transportation route for vehicles, pedestrians, or railways.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9435cf48190ad1da737c962d19d completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:39 p.m.