Triple

T4068531
Position Surface form Disambiguated ID Type / Status
Subject Centennial Olympic Stadium E86586 entity
Predicate ownerDuringOlympics P53306 FINISHED
Object Atlanta Committee for the Olympic Games E85130 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Atlanta Committee for the Olympic Games | Statement: [Centennial Olympic Stadium, ownerDuringOlympics, Atlanta Committee for the Olympic Games]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Atlanta Committee for the Olympic Games
Context triple: [Centennial Olympic Stadium, ownerDuringOlympics, Atlanta Committee for the Olympic Games]
  • A. Atlanta Committee for the Olympic Games chosen
    The Atlanta Committee for the Olympic Games was the organizing body responsible for planning and staging the 1996 Olympic Games in Atlanta, Georgia.
  • B. Atlanta Super Bowl Host Committee
    The Atlanta Super Bowl Host Committee was the local organizing body responsible for planning, coordinating, and executing Atlanta’s activities, logistics, and events surrounding Super Bowl LIII.
  • C. Los Angeles Olympic Organizing Committee
    The Los Angeles Olympic Organizing Committee was the body responsible for planning, financing, and staging the 1984 Summer Olympic Games in Los Angeles.
  • D. Atlanta-Fulton County Recreation Authority
    The Atlanta-Fulton County Recreation Authority is a public agency that owns and oversees major sports and entertainment facilities in Atlanta and Fulton County, Georgia.
  • E. National Olympic Committee of Georgia
    The National Olympic Committee of Georgia is the organization responsible for overseeing Georgia's participation in the Olympic Games and promoting the Olympic movement within the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: ownerDuringOlympics
Context triple: [Centennial Olympic Stadium, ownerDuringOlympics, Atlanta Committee for the Olympic Games]
  • A. ownerDuringNFLEra
    Indicates that a person or entity held ownership of an NFL team during a specified NFL era or time period.
  • B. OlympicGamesParticipated
    Indicates that an entity has taken part as a competitor in one or more editions of the Olympic Games.
  • C. olympicZone
    Indicates a relationship where a location or area is designated as part of an official Olympic zone or territory associated with the Olympic Games.
  • D. OlympicStatus
    Indicates that an entity holds a particular status or role in relation to the Olympic Games (e.g., being an Olympic sport, event, athlete, or host).
  • E. OlympicAthleteFor
    Indicates a relationship where an athlete competes in the Olympic Games representing a specific country, team, or organization.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93ebe448190a1f1686e28740ac9 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aefbf8f33c8190a6afca1830f35485 completed March 9, 2026, 4:57 p.m.
NED1 Entity disambiguation (via context triple) batch_69b562b48fc481908547d51aae15e959 completed March 14, 2026, 1:29 p.m.
PD Predicate disambiguation batch_69aef9061d2481908307cafc9e9b32c0 completed March 9, 2026, 4:44 p.m.
PDg Predicate description generation batch_69aefa5c52648190b001027f4dba75cb completed March 9, 2026, 4:50 p.m.
Created at: March 9, 2026, 3:38 p.m.