Triple

T4065731
Position Surface form Disambiguated ID Type / Status
Subject MMRTG E86318 entity
Predicate instanceOf P0 FINISHED
Object spacecraft power system C15075 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spacecraft power system
Context triple: [MMRTG, instanceOf, spacecraft power system]
  • A. spacecraft
    A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
  • B. spacecraft propulsion concept
    A spacecraft propulsion concept is a theoretical or practical method for generating thrust to maneuver a spacecraft in space, encompassing the underlying physics, required systems, and performance characteristics.
  • C. nuclear pulse propulsion system
    A nuclear pulse propulsion system is a spacecraft propulsion method that generates thrust by detonating a series of small nuclear explosives behind the vehicle and transferring the resulting impulse through a robust pusher plate and shock-absorbing structure.
  • D. space transportation system
    A space transportation system is an integrated set of vehicles, infrastructure, and operations designed to move payloads and passengers between Earth and space or between locations in space.
  • E. spacecraft onboard computer
    A spacecraft onboard computer is a specialized, radiation-hardened computing system that autonomously manages spacecraft functions, navigation, communication, and data handling in the harsh environment of space.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93c69208190a4efac0efe3cd69b completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:38 p.m.