Triple

T4065436
Position Surface form Disambiguated ID Type / Status
Subject ExoMars programme E86312 entity
Predicate instanceOf P0 FINISHED
Object Astrobiology mission programme C1591 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Astrobiology mission programme
Context triple: [ExoMars programme, instanceOf, Astrobiology mission programme]
  • A. planetary exploration program chosen
    A planetary exploration program is an organized, long-term initiative that plans, funds, and conducts missions to study other planets and celestial bodies using robotic or crewed spacecraft.
  • B. Mars mission engineering activity
    Mars mission engineering activity encompasses the planning, design, testing, and integration of systems and technologies required to safely transport, land, and support missions on the Martian surface and in its orbit.
  • C. space mission
    A space mission is a planned and coordinated endeavor to send spacecraft, instruments, or humans beyond Earth's atmosphere to achieve specific scientific, exploratory, commercial, or technological objectives.
  • D. interplanetary space mission
    An interplanetary space mission is a coordinated endeavor that sends spacecraft from one planet to another to conduct scientific research, exploration, or technology demonstration beyond Earth's immediate environment.
  • E. ESA program
    An ESA program is a coordinated set of space-related activities, missions, and projects managed by the European Space Agency to achieve specific scientific, technological, or operational objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93c69208190a4efac0efe3cd69b completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:38 p.m.