Triple

T4065402
Position Surface form Disambiguated ID Type / Status
Subject Galileo satellite navigation system E86311 entity
Predicate plannedFullOperationalCapability P7152 FINISHED
Object 2020s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020s | Statement: [Galileo satellite navigation system, plannedFullOperationalCapability, 2020s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedFullOperationalCapability
Context triple: [Galileo satellite navigation system, plannedFullOperationalCapability, 2020s]
  • A. plannedCapability
    Indicates that an entity is intended or scheduled to possess or provide a particular capability in the future.
  • B. fullyOperationalBy chosen
    Indicates that an entity is expected or required to be completely functional and ready for use no later than a specified time or event.
  • C. declaredFullyOperationalBy
    Indicates that one entity has officially stated that another entity is completely ready and capable of functioning as intended.
  • D. firstOperationalUse
    Indicates the point in time or context when something is used operationally for the very first time.
  • E. operationalReadiness
    Indicates that an entity is in a state where it is fully prepared, equipped, and able to perform its intended function or mission.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93c69208190a4efac0efe3cd69b completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aefd0bdea48190805a79515ee92709 completed March 9, 2026, 5:02 p.m.
PD Predicate disambiguation batch_69aef90438908190a005b08ba271eacf completed March 9, 2026, 4:44 p.m.
Created at: March 9, 2026, 3:38 p.m.