Triple

T4064370
Position Surface form Disambiguated ID Type / Status
Subject Bankside Power Station E86289 entity
Predicate instanceOf P0 FINISHED
Object oil-fired power station C14265 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: oil-fired power station
Context triple: [Bankside Power Station, instanceOf, oil-fired power station]
  • A. coal-fired power station
    A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
  • B. electric power station chosen
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • C. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • D. steam-generating boiler
    A steam-generating boiler is an enclosed vessel in which water is heated—typically by burning fuel or using other heat sources—to produce pressurized steam for power generation, heating, or industrial processes.
  • E. industrial boiler
    An industrial boiler is a large, engineered vessel that generates steam or hot water by transferring heat from fuel combustion or other energy sources to water for use in power generation, process heating, or building services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93c69208190a4efac0efe3cd69b completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:38 p.m.