Triple

T4057707
Position Surface form Disambiguated ID Type / Status
Subject Monitor–Merrimac Memorial Bridge–Tunnel E84733 entity
Predicate instanceOf P0 FINISHED
Object Interstate Highway crossing C958 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Interstate Highway crossing
Context triple: [Monitor–Merrimac Memorial Bridge–Tunnel, instanceOf, Interstate Highway crossing]
  • A. Interstate Highway
    An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
  • B. highway bridge chosen
    A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
  • C. highway
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • D. auxiliary Interstate Highway
    An auxiliary Interstate Highway is a shorter, supplementary route connected to a primary Interstate that typically serves to bypass, loop around, or provide direct access to urban areas.
  • E. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed933bec881909edfa28ebb69c634 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:38 p.m.