Triple
T4050403
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Metropolitan Park Commission engineers |
E84170
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | group of civil engineers |
C14887
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: group of civil engineers Context triple: [Metropolitan Park Commission engineers, instanceOf, group of civil engineers]
-
A.
engineering firm
An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
-
B.
civil engineer
A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
-
C.
program of the American Society of Civil Engineers
A program of the American Society of Civil Engineers is an organized set of activities, initiatives, or services designed to advance civil engineering knowledge, practice, education, and public welfare in alignment with ASCE’s mission.
-
D.
engineering student society
An engineering student society is a student-run organization that supports engineering students’ academic, professional, and social development through events, resources, and community-building activities.
-
E.
civil engineering designation
A civil engineering designation is a formal title or credential that identifies a professional’s qualification, specialization, and authority to practice within the civil engineering field.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed930bd5c819083e7dcc14fc44f69 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:37 p.m.