Triple

T4050403
Position Surface form Disambiguated ID Type / Status
Subject Metropolitan Park Commission engineers E84170 entity
Predicate instanceOf P0 FINISHED
Object group of civil engineers C14887 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: group of civil engineers
Context triple: [Metropolitan Park Commission engineers, instanceOf, group of civil engineers]
  • A. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • B. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • C. program of the American Society of Civil Engineers
    A program of the American Society of Civil Engineers is an organized set of activities, initiatives, or services designed to advance civil engineering knowledge, practice, education, and public welfare in alignment with ASCE’s mission.
  • D. engineering student society
    An engineering student society is a student-run organization that supports engineering students’ academic, professional, and social development through events, resources, and community-building activities.
  • E. civil engineering designation
    A civil engineering designation is a formal title or credential that identifies a professional’s qualification, specialization, and authority to practice within the civil engineering field.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed930bd5c819083e7dcc14fc44f69 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:37 p.m.