Triple

T4046790
Position Surface form Disambiguated ID Type / Status
Subject Pont du Gard E84084 entity
Predicate crosses P416 FINISHED
Object Gard River E443379 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gard River | Statement: [Pont du Gard, crosses, Gard River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Gard River
Context triple: [Pont du Gard, crosses, Gard River]
  • A. Gard River chosen
    The Gard River is a waterway in southern France that flows through the Gard department and is known for landmarks such as the ancient Roman aqueduct Pont du Gard.
  • B. Duncan River
    The Duncan River is a major river in southeastern British Columbia, Canada, known for flowing through the Selkirk Mountains and being impounded by Duncan Dam as part of the Columbia River Treaty system.
  • C. Bull River
    Bull River is a Canadian waterway in southeastern British Columbia that flows through the Rocky Mountain region before joining the Kootenay River.
  • D. Marys River
    Marys River is a tributary of the Willamette River in western Oregon that flows through Benton County and the city of Corvallis.
  • E. Marys River
    Marys River is a tributary stream in northeastern Nevada that feeds into the Humboldt River within the Great Basin watershed.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed930bd5c819083e7dcc14fc44f69 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aefb62593c8190ab8462c4d9cd9d08 completed March 9, 2026, 4:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69c603b57d708190afd5e4c60344f86d completed March 27, 2026, 4:12 a.m.
Created at: March 9, 2026, 3:37 p.m.