Triple

T4018908
Position Surface form Disambiguated ID Type / Status
Subject Sixth Avenue express service E91231 entity
Predicate instanceOf P0 FINISHED
Object express subway service C14534 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: express subway service
Context triple: [Sixth Avenue express service, instanceOf, express subway service]
  • A. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • B. New York City Subway service designation
    A New York City Subway service designation is a letter, number, or symbol that identifies a specific subway route, indicating its line, terminals, and general service pattern for riders.
  • C. metro service variant chosen
    A metro service variant is a specific version of a metro line’s operation, defined by a distinct pattern of stops, routing, frequency, or operating times that differentiates it from the standard service.
  • D. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • E. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9618b04819081750d979d2af098 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:35 p.m.