Triple

T401237
Position Surface form Disambiguated ID Type / Status
Subject Chicago Card E9285 entity
Predicate hasSuccessor P78 FINISHED
Object Ventra contactless payment system E1909 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ventra contactless payment system | Statement: [Chicago Card, hasSuccessor, Ventra contactless payment system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ventra contactless payment system
Context triple: [Chicago Card, hasSuccessor, Ventra contactless payment system]
  • A. Ventra chosen
    Ventra is the contactless fare payment system used across Chicago’s public transit network, including buses and trains.
  • B. Presto card
    The Presto card is a reloadable smart card used for paying public transit fares across the Greater Toronto and Hamilton Area and other regions in Ontario, Canada.
  • C. Clipper card
    The Clipper card is a reloadable contactless smart card used to pay fares across multiple public transit systems in the San Francisco Bay Area.
  • D. Do Not Pay system
    The Do Not Pay system is a U.S. government data analytics platform used to prevent and detect improper payments by screening recipients against multiple federal and state databases.
  • E. CCS (Combined Charging System)
    CCS (Combined Charging System) is a widely adopted fast-charging standard for electric vehicles that combines AC and DC charging capabilities in a single connector design.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e8004cb88190b92ed1add6abf41a completed Feb. 28, 2026, 1:05 p.m.
NER Named-entity recognition batch_69a2ec9f77888190bcc2bc68d201ed35 completed Feb. 28, 2026, 1:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69a41774cd008190a254facf9cba90b6 completed March 1, 2026, 10:39 a.m.
Created at: Feb. 28, 2026, 1:08 p.m.