Triple
T4008309
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Faridabad district |
E89579
|
entity |
| Predicate | hasMajorHighway |
P385
|
FINISHED |
| Object | Delhi–Mumbai Expressway (nearby alignment) |
E324718
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Delhi–Mumbai Expressway (nearby alignment) | Statement: [Faridabad district, hasMajorHighway, Delhi–Mumbai Expressway (nearby alignment)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Delhi–Mumbai Expressway (nearby alignment) Context triple: [Faridabad district, hasMajorHighway, Delhi–Mumbai Expressway (nearby alignment)]
-
A.
Delhi–Mumbai Expressway
chosen
The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
-
B.
Delhi–Meerut Expressway
The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
-
C.
Delhi–Gurugram Expressway
The Delhi–Gurugram Expressway is a major high-speed corridor connecting Delhi with the city of Gurugram in Haryana, forming a key segment of India’s National Highway network and a primary gateway to the national capital.
-
D.
Agra–Lucknow Expressway
The Agra–Lucknow Expressway is a major six-lane, access-controlled expressway in India that significantly reduces travel time between Agra and the state capital Lucknow and serves as a key transport and economic corridor in Uttar Pradesh.
-
E.
Noida–Greater Noida Expressway
The Noida–Greater Noida Expressway is a major high-speed road corridor in the National Capital Region of India that connects the cities of Noida and Greater Noida and serves as a key route for commuters and commercial traffic.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed9585e788190bec2d39deba3750f |
completed | March 9, 2026, 2:29 p.m. |
| NER | Named-entity recognition | batch_69aefa647f80819081180eb267f1cfcc |
completed | March 9, 2026, 4:50 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b54c6ae0ec819099c229a4cfe926f2 |
completed | March 14, 2026, 11:54 a.m. |
Created at: March 9, 2026, 3:34 p.m.