Triple

T3976213
Position Surface form Disambiguated ID Type / Status
Subject Lake Purdy, Alabama E85648 entity
Predicate waterSupplierFor P4102 FINISHED
Object Birmingham Water Works Board system
The Birmingham Water Works Board system is a public utility network that provides drinking water and related services to the Birmingham, Alabama metropolitan area.
E405318 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Birmingham Water Works Board system | Statement: [Lake Purdy, Alabama, waterSupplierFor, Birmingham Water Works Board system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Birmingham Water Works Board system
Context triple: [Lake Purdy, Alabama, waterSupplierFor, Birmingham Water Works Board system]
  • A. Cambridge water supply system
    The Cambridge water supply system is the municipal infrastructure network that sources, treats, stores, and distributes drinking water to the city of Cambridge, Massachusetts.
  • B. Birmingham Canal Navigations
    Birmingham Canal Navigations is an extensive network of interconnected canals in the English Midlands that historically served as a major industrial transport system around Birmingham and the Black Country.
  • C. Chew Valley water supply system
    The Chew Valley water supply system is an integrated network of reservoirs, treatment works, and pipelines in the Chew Valley area that provides potable water to surrounding communities.
  • D. Edmonston Pumping Plant
    Edmonston Pumping Plant is a major California water infrastructure facility that lifts water over the Tehachapi Mountains, enabling its delivery from Northern to Southern California.
  • E. Croton water supply system
    The Croton water supply system is a historic network of reservoirs, aqueducts, and related infrastructure that delivers drinking water from New York’s Croton River watershed to New York City.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Birmingham Water Works Board system
Triple: [Lake Purdy, Alabama, waterSupplierFor, Birmingham Water Works Board system]
Generated description
The Birmingham Water Works Board system is a public utility network that provides drinking water and related services to the Birmingham, Alabama metropolitan area.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Birmingham Water Works Board system
Target entity description: The Birmingham Water Works Board system is a public utility network that provides drinking water and related services to the Birmingham, Alabama metropolitan area.
  • A. Cambridge water supply system
    The Cambridge water supply system is the municipal infrastructure network that sources, treats, stores, and distributes drinking water to the city of Cambridge, Massachusetts.
  • B. Birmingham Canal Navigations
    Birmingham Canal Navigations is an extensive network of interconnected canals in the English Midlands that historically served as a major industrial transport system around Birmingham and the Black Country.
  • C. Chew Valley water supply system
    The Chew Valley water supply system is an integrated network of reservoirs, treatment works, and pipelines in the Chew Valley area that provides potable water to surrounding communities.
  • D. Edmonston Pumping Plant
    Edmonston Pumping Plant is a major California water infrastructure facility that lifts water over the Tehachapi Mountains, enabling its delivery from Northern to Southern California.
  • E. Croton water supply system
    The Croton water supply system is a historic network of reservoirs, aqueducts, and related infrastructure that delivers drinking water from New York’s Croton River watershed to New York City.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93908348190a26c8aaf4fab3e86 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aef9b6d8008190822fceabe6542b3d completed March 9, 2026, 4:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5401ac15481908ab86c8ef48ce413 completed March 14, 2026, 11:01 a.m.
NEDg Description generation batch_69b5442537488190a7a99e09ee154057 completed March 14, 2026, 11:19 a.m.
NED2 Entity disambiguation (via description) batch_69b544f60e288190973aaf0a4136a072 completed March 14, 2026, 11:22 a.m.
Created at: March 9, 2026, 3:33 p.m.