Triple
T3969748
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 88NV |
E92299
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | seasonal airfield |
C1901
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: seasonal airfield Context triple: [88NV, instanceOf, seasonal airfield]
-
A.
airfield
chosen
An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
-
B.
civil–military airport
A civil–military airport is an aerodrome jointly used by civilian air transport services and military aviation operations, sharing infrastructure, airspace, and support facilities under coordinated management.
-
C.
airport runway
An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
-
D.
seaplane base
A seaplane base is a designated water aerodrome, often with minimal shore facilities, where seaplanes and amphibious aircraft can take off, land, dock, and receive basic services.
-
E.
business aviation airport
A business aviation airport is a specialized airfield designed primarily to serve private, corporate, and charter aircraft with tailored facilities and services for business travelers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed96624188190ac8c45bb57ab72b5 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:32 p.m.