Triple
T3956175
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gipsy Danger chain sword |
E84983
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Jaeger armament |
C14671
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Jaeger armament Context triple: [Gipsy Danger chain sword, instanceOf, Jaeger armament]
-
A.
Jaeger
A Jaeger is a massive, human-piloted combat mech designed to battle colossal threats using advanced weaponry, heavy armor, and synchronized neural control.
-
B.
arms manufacturer
An arms manufacturer is a company or entity that designs, produces, and supplies weapons, ammunition, and related military equipment for use by armed forces, security agencies, or private clients.
-
C.
Jaeger command center
A Jaeger command center is a high-tech control hub where operators monitor, coordinate, and direct giant Jaeger mechs during missions using advanced communication, tactical, and diagnostic systems.
-
D.
Jaeger pilot
A Jaeger pilot is a highly trained individual who mentally and physically synchronizes with another pilot to co-operate a giant mechanized robot in combat against colossal threats.
-
E.
Jaeger class
The Jaeger class is a category of large, agile, and heavily armed mechanized combat units designed for frontline engagement and rapid-response defense against massive threats.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed934fbfc8190847068e4546de963 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:30 p.m.