Triple

T3941442
Position Surface form Disambiguated ID Type / Status
Subject Pearl District (San Antonio) E92041 entity
Predicate instanceOf P0 FINISHED
Object redevelopment project C5822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: redevelopment project
Context triple: [Pearl District (San Antonio), instanceOf, redevelopment project]
  • A. architectural renovation project
    An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
  • B. architectural remodeling project
    An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
  • C. urban regeneration area chosen
    An urban regeneration area is a designated part of a city targeted for coordinated physical, economic, social, and environmental improvements to reverse decline and promote sustainable development.
  • D. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • E. urban design project
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed965502c8190904ebad1203a4ae8 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:24 p.m.