Triple

T394037
Position Surface form Disambiguated ID Type / Status
Subject Allied occupation of Japan E8941 entity
Predicate instanceOf P0 FINISHED
Object post–World War II occupation C834 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: post–World War II occupation
Context triple: [Allied occupation of Japan, instanceOf, post–World War II occupation]
  • A. postwar occupation chosen
    Postwar occupation is the temporary control and administration of a defeated state’s territory by foreign military or allied authorities to manage security, political transition, and reconstruction after armed conflict.
  • B. military occupation
    A military occupation is the effective control and administration of a territory by foreign armed forces without the sovereign consent of the territory’s recognized government.
  • C. post–World War II reconstruction program
    A post–World War II reconstruction program is a coordinated set of policies, financial aid, and institutional reforms designed to rebuild war-torn economies, infrastructure, and governance structures while promoting long-term stability and growth.
  • D. phase of World War II
    A phase of World War II is a distinct, time-bounded period of the conflict characterized by specific strategic objectives, major campaigns, and shifts in military, political, or economic conditions.
  • E. theater of World War II
    The theater of World War II is a conceptual class representing a distinct geographic region and operational context in which military campaigns, battles, and strategic activities of the war were planned, conducted, and coordinated.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7f55c60819097aff65ea2ca2832 completed Feb. 28, 2026, 1:04 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.