Triple

T392671
Position Surface form Disambiguated ID Type / Status
Subject Interstate 480 E8913 entity
Predicate hasJunction P1018 FINISHED
Object US Route 75 E18251 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US Route 75 | Statement: [Interstate 480, hasJunction, US Route 75]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: US Route 75
Context triple: [Interstate 480, hasJunction, US Route 75]
  • A. U.S. Route 75 chosen
    U.S. Route 75 is a major north–south U.S. Highway running from Texas through the central United States, serving as a key transportation corridor for cities such as Dallas.
  • B. U.S. Route 250
    U.S. Route 250 is a U.S. highway running generally northeast–southwest through several states in the eastern United States, connecting rural areas, small towns, and regional cities.
  • C. U.S. Route 59
    U.S. Route 59 is a north–south United States highway that runs from the Mexico–U.S. border in Texas to the Canada–U.S. border in Minnesota, passing through several central states.
  • D. U.S. Route 85
    U.S. Route 85 is a major north–south United States highway running from the Mexican border in Texas through several central and Rocky Mountain states to the Canadian border in North Dakota.
  • E. U.S. Route 27
    U.S. Route 27 is a major north–south United States highway that runs from Florida to Michigan, passing through several southeastern and midwestern states.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7f55c60819097aff65ea2ca2832 completed Feb. 28, 2026, 1:04 p.m.
NER Named-entity recognition batch_69a2ec7637c08190b695ec640edbf6c2 completed Feb. 28, 2026, 1:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69aebedc55848190a069888fe6088b0a completed March 9, 2026, 12:36 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.