Triple

T3919119
Position Surface form Disambiguated ID Type / Status
Subject WATSON E88914 entity
Predicate operationalStart P3267 FINISHED
Object 2021 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2021 | Statement: [WATSON, operationalStart, 2021]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operationalStart
Context triple: [WATSON, operationalStart, 2021]
  • A. operationStart chosen
    Indicates the point in time or event at which a specific operation or process begins.
  • B. becameOperational
    Indicates that an entity transitioned from a non-functioning or inactive state to an active, functioning, or service-ready state at a certain point in time.
  • C. operationalCommand
    Indicates that one entity issues or holds authoritative control over the actions or operations of another entity.
  • D. operateIn
    Indicates that an entity performs its activities, functions, or services within a specified location, context, or domain.
  • E. fullyOperationalBy
    Indicates that an entity is expected or required to be completely functional and ready for use no later than a specified time or event.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed955229881909e85e73ffab1d343 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aef188b474819087680db42b04ecdd completed March 9, 2026, 4:12 p.m.
PD Predicate disambiguation batch_69aee75eedcc81908088ff4dbb8be56b completed March 9, 2026, 3:29 p.m.
Created at: March 9, 2026, 3:22 p.m.