Triple

T39085
Position Surface form Disambiguated ID Type / Status
Subject European polytechnic institutes E774 entity
Predicate instanceOf P0 FINISHED
Object engineering school category C58 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering school category
Context triple: [European polytechnic institutes, instanceOf, engineering school category]
  • A. engineering journal
    An engineering journal is a periodical publication that presents peer-reviewed research, technical developments, and practical applications in various fields of engineering.
  • B. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • C. university chosen
    A university is an institution of higher education and research that grants academic degrees and fosters advanced learning across diverse fields of study.
  • D. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • E. private university
    A private university is a higher education institution that is independently funded and operated, primarily through tuition, donations, and endowments rather than direct government support.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a247a8f6c08190bac804906d62ed5a completed Feb. 28, 2026, 1:40 a.m.
Created at: Feb. 28, 2026, 1:46 a.m.