Triple

T3899681
Position Surface form Disambiguated ID Type / Status
Subject Nowa Huta district E90454 entity
Predicate instanceOf P0 FINISHED
Object socialist realist urban complex C14533 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: socialist realist urban complex
Context triple: [Nowa Huta district, instanceOf, socialist realist urban complex]
  • A. modernist city
    A modernist city is an urban environment characterized by functionalist architecture, rational planning, and an emphasis on efficiency, technology, and the separation of spaces for living, working, and recreation.
  • B. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • C. urban development
    Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
  • D. modernist urban design proposal
    A modernist urban design proposal is a conceptual plan for a city or district that emphasizes functional zoning, clean geometric forms, and the integration of architecture, infrastructure, and open space to achieve efficiency, order, and a forward-looking aesthetic.
  • E. socialist republic
    A socialist republic is a state governed as a republic in which political power and key means of production are formally organized and managed according to socialist principles, typically emphasizing public ownership, economic planning, and social welfare.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed95d315881908cbf1bf4a7215fbf completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:21 p.m.