Triple

T3881047
Position Surface form Disambiguated ID Type / Status
Subject Calvert Cliffs Nuclear Power Plant E92822 entity
Predicate instanceOf P0 FINISHED
Object electric power station C14265 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electric power station
Context triple: [Calvert Cliffs Nuclear Power Plant, instanceOf, electric power station]
  • A. coal-fired power station
    A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
  • B. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • C. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • D. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • E. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9697de0819087c2559295ff3d12 completed March 9, 2026, 2:30 p.m.
Created at: March 9, 2026, 3:20 p.m.