Triple
T3871807
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Piers 1 through 5 |
E92402
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pier complex |
C5954
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pier complex Context triple: [Piers 1 through 5, instanceOf, pier complex]
-
A.
waterfront pier complex
chosen
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
B.
public pier
A public pier is a communal waterfront structure extending over water, designed to provide open access for walking, viewing, recreation, and sometimes fishing or docking small vessels.
-
C.
museum building complex
A museum building complex is a coordinated group of structures and spaces designed to collect, preserve, exhibit, and interpret cultural, historical, artistic, or scientific artifacts for public education and enjoyment.
-
D.
port area
A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
-
E.
water tower complex
A water tower complex is a facility comprising one or more elevated storage tanks and associated infrastructure designed to store and distribute potable water using gravity-fed pressure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed967448c819086c4b358d37b25aa |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:20 p.m.