Triple
T3871081
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Niagara Falls AC power project |
E92386
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electric power transmission project |
C2938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electric power transmission project Context triple: [Niagara Falls AC power project, instanceOf, electric power transmission project]
-
A.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
C.
infrastructure project
chosen
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
D.
electrified railway
An electrified railway is a rail transport system in which trains receive power from external electrical sources, such as overhead lines or third rails, instead of relying on onboard fuel.
-
E.
nuclear reactor project
A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed967448c819086c4b358d37b25aa |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:20 p.m.