Triple

T3870912
Position Surface form Disambiguated ID Type / Status
Subject Big Dig E91982 entity
Predicate instanceOf P0 FINISHED
Object tunnel project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tunnel project
Context triple: [Big Dig, instanceOf, tunnel project]
  • A. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • B. tunneling system
    A tunneling system is a conceptual framework or infrastructure that enables data, particles, or signals to pass through barriers or intermediate layers via a protected or probabilistic pathway without directly traversing the intervening space in a conventional manner.
  • C. road tunnel
    A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
  • D. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • E. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9645f348190a9868e7cef56ab7e completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:20 p.m.