Triple

T38680853
Position Surface form Disambiguated ID Type / Status
Subject First Republic of Ghana E943887 entity
Predicate notableInfrastructureProgram P181398 FINISHED
Object Akosombo Dam project E370226 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Akosombo Dam project | Statement: [First Republic of Ghana, notableInfrastructureProgram, Akosombo Dam project]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: notableInfrastructureProgram
Context triple: [First Republic of Ghana, notableInfrastructureProgram, Akosombo Dam project]
  • A. infrastructureProjects
    Indicates that there are planned, ongoing, or completed construction or development works related to physical or organizational infrastructure involving the associated entities.
  • B. majorInfrastructureProject chosen
    Indicates a large-scale, capital-intensive construction or development initiative that significantly impacts public systems, services, or facilities.
  • C. notableNationalProgram
    Indicates that an entity is recognized as a significant or prominent program at the national level.
  • D. notableRailwayProject
    Indicates that the subject is recognized for involvement in a significant or prominent railway-related project.
  • E. notableConstructionCenter
    Indicates that a place serves as a significant hub or focal point for construction activity or construction-related operations.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eec28708190b9c82a505fc278e0 completed May 3, 2026, 3:51 p.m.
NER Named-entity recognition batch_6a037c9141dc819098d7fcc36e69882c completed May 12, 2026, 7:16 p.m.
NED1 Entity disambiguation (via context triple) batch_6a41fd753e188190a1278db2d3b7a63f completed June 29, 2026, 5:07 a.m.
PD Predicate disambiguation batch_6a037a2026248190b894436a578d79ac completed May 12, 2026, 7:06 p.m.
Created at: May 3, 2026, 4:33 p.m.