Triple

T3863645
Position Surface form Disambiguated ID Type / Status
Subject Norris Dam E91798 entity
Predicate instanceOf P0 FINISHED
Object TVA dam C8942 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: TVA dam
Context triple: [Norris Dam, instanceOf, TVA dam]
  • A. Son
    A son is a male child in relation to his parents, typically viewed within the context of family roles, responsibilities, and generational continuity.
  • B. hydroelectric dam chosen
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • C. reservoir dam
    A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
  • D. river gorge
    A river gorge is a deep, narrow valley with steep, often rocky walls carved over time by the persistent erosive action of a river.
  • E. rift lake
    A rift lake is a long, narrow, and often deep lake formed within a tectonic rift valley where Earth’s crust is being pulled apart.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9645f348190a9868e7cef56ab7e completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:19 p.m.