Triple
T3859225
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tay Bridge disaster |
E90093
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge collapse |
C14411
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge collapse Context triple: [Tay Bridge disaster, instanceOf, bridge collapse]
-
A.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
B.
railway bridge
A railway bridge is a structure built to carry train tracks over obstacles such as roads, rivers, valleys, or other railways, ensuring safe and continuous rail transport.
-
C.
iron bridge
An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
-
D.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
-
E.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed95b3c088190a8f85d19e6070599 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:19 p.m.