Triple

T38469303
Position Surface form Disambiguated ID Type / Status
Subject Trans-African Highway network E912665 entity
Predicate instanceOf P0 FINISHED
Object transport corridor network C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport corridor network
Context triple: [Trans-African Highway network, instanceOf, transport corridor network]
  • A. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • B. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • C. transport corridor segment
    A transport corridor segment is a defined linear portion of a transportation route (such as a road, rail line, or shipping lane) characterized by consistent physical, operational, and regulatory attributes used for planning, management, and analysis.
  • D. transportation corridors collection
    A transportation corridors collection is an organized set of linear pathways—such as roads, railways, and transit routes—grouped for managing, analyzing, or planning movement across a region.
  • E. transport corridor development organization
    A transport corridor development organization is an entity responsible for planning, coordinating, and implementing infrastructure and policy initiatives to create, expand, and optimize multimodal transportation routes across regions or countries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e861d8c81908559031dc66e3c15 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:31 p.m.