Triple
T38449441
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Panama Canal construction planning and organization |
E912129
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | logistical coordination effort |
C14224
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: logistical coordination effort Context triple: [Panama Canal construction planning and organization, instanceOf, logistical coordination effort]
-
A.
logistical operation
chosen
A logistical operation is a coordinated set of activities and processes that plan, implement, and control the efficient movement and storage of goods, information, or resources from origin to destination.
-
B.
coalition logistics framework
A coalition logistics framework is a structured model that coordinates and optimizes the planning, allocation, and movement of resources across multiple allied organizations to achieve shared operational objectives.
-
C.
logistics command
Logistics command is the organizational function responsible for planning, coordinating, and controlling the movement, supply, and maintenance of resources to ensure operational readiness and sustained support.
-
D.
military logistics problem
A military logistics problem involves planning, coordinating, and optimizing the movement, supply, and maintenance of forces and equipment to ensure operational readiness and effectiveness under resource, time, and environmental constraints.
-
E.
logistics brigade
A logistics brigade is a military unit responsible for planning, coordinating, and executing the supply, transportation, maintenance, and support services needed to sustain combat and support forces.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e84e2dc81908badf05b3aafa9ea |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:31 p.m.