Triple
T38381408
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Prurient |
E893770
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power electronics project |
C54310
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power electronics project Context triple: [Prurient, instanceOf, power electronics project]
-
A.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
power object
A power object is a conceptual class whose instances represent all possible subsets of the instances of another class, capturing every combination of its elements.
-
C.
renewable energy technology project
A renewable energy technology project is an organized initiative that designs, develops, and implements systems or solutions to generate energy from naturally replenishing sources such as solar, wind, hydro, or geothermal power.
-
D.
open hardware project
chosen
An open hardware project is a collaborative initiative to design, document, and share physical devices whose schematics, source files, and build instructions are publicly available for anyone to study, modify, and reproduce.
-
E.
electric motor
An electric motor is a device that converts electrical energy into mechanical rotational energy through the interaction of magnetic fields and current-carrying conductors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e4b1f748190a380696a16eae4a2 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:31 p.m.