Triple
T3826952
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | VTA Operations Division |
E88712
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public transit operations division |
C14467
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public transit operations division Context triple: [VTA Operations Division, instanceOf, public transit operations division]
-
A.
historical transit operating division
A historical transit operating division is an organizational unit within a past or legacy public transportation system responsible for managing and coordinating transit services, personnel, and resources within a specific geographic area or operational domain.
-
B.
rapid transit division
A rapid transit division is an organizational unit within a transportation agency responsible for planning, operating, and maintaining high-frequency, high-capacity urban rail or bus rapid transit services.
-
C.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
D.
public transit route
A public transit route is a predefined path with designated stops and schedules along which public transportation vehicles (such as buses, trams, or trains) operate to move passengers between locations.
-
E.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed9538cf881909d9ce8ca4ac7c18c |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:17 p.m.