Triple

T38237583
Position Surface form Disambiguated ID Type / Status
Subject Abuja Airport Expressway expansion E1013665 entity
Predicate instanceOf P0 FINISHED
Object highway expansion project C2978 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: highway expansion project
Context triple: [Abuja Airport Expressway expansion, instanceOf, highway expansion project]
  • A. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • B. planned expressway
    A planned expressway is a proposed high-speed, limited-access roadway that has been formally designed and approved but not yet constructed or opened to traffic.
  • C. public transit and highway improvement program
    A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
  • D. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • E. road infrastructure chosen
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd72a248190a5fe18db2bd1eb15 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:30 p.m.