Triple

T38215549
Position Surface form Disambiguated ID Type / Status
Subject Francois-Xavier Bagnoud Building E1010674 entity
Predicate instanceOf P0 FINISHED
Object aerospace engineering facility C64631 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aerospace engineering facility
Context triple: [Francois-Xavier Bagnoud Building, instanceOf, aerospace engineering facility]
  • A. aerospace hub
    An aerospace hub is a centralized facility or region where aerospace research, manufacturing, testing, and logistics activities are concentrated to support the development and operation of aircraft and spacecraft.
  • B. spacecraft processing facility area
    A spacecraft processing facility area is a specialized, controlled environment where spacecraft and their components are assembled, integrated, tested, and prepared for launch.
  • C. aerospace organization
    An aerospace organization is an entity that researches, designs, manufactures, operates, or supports aircraft, spacecraft, and related systems and technologies for commercial, governmental, or defense purposes.
  • D. spaceport facility component
    A spaceport facility component is an individual physical or functional element—such as launch pads, control centers, fueling systems, or passenger terminals—that collectively enables the operation, support, and management of spaceflight activities at a spaceport.
  • E. spaceport facility
    A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dcdc7708190a5f1751d53f40ffe completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:30 p.m.