Triple

T3818269
Position Surface form Disambiguated ID Type / Status
Subject Bauhaus exhibition designs E84308 entity
Predicate instanceOf P0 FINISHED
Object modernist design work C11305 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: modernist design work
Context triple: [Bauhaus exhibition designs, instanceOf, modernist design work]
  • A. modernist architecture work
    A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
  • B. modernist architectural work
    A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
  • C. modernist work chosen
    A modernist work is an artistic or literary creation that breaks with traditional forms and conventions to explore fragmented perspectives, subjective experience, and the uncertainties of modern life.
  • D. modernist furniture
    Modernist furniture is a style of furnishings characterized by clean lines, functional forms, minimal ornamentation, and the use of modern materials like steel, glass, and molded plywood to emphasize simplicity and practicality.
  • E. modernist architecture movement
    The modernist architecture movement is a 20th-century design approach that emphasizes functional forms, minimal ornamentation, and the honest expression of materials and structure in response to industrialization and new technologies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed931f5908190be2c07af66d4df25 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:17 p.m.