Triple

T38158285
Position Surface form Disambiguated ID Type / Status
Subject Marxist crisis theory E952948 entity
Predicate instanceOf P0 FINISHED
Object crisis theory C65197 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: crisis theory
Context triple: [Marxist crisis theory, instanceOf, crisis theory]
  • A. crisis
    A crisis is a critical turning point or period of intense difficulty and instability that demands urgent decision-making and action to prevent severe negative consequences.
  • B. institutional crisis
    An institutional crisis is a severe breakdown or loss of legitimacy in the structures, rules, or authority of key organizations or systems, undermining their ability to function effectively and maintain public trust.
  • C. civilian crisis management structure
    A civilian crisis management structure is an organized framework of non-military institutions, roles, and procedures designed to coordinate prevention, response, and recovery efforts during emergencies and disasters affecting the public.
  • D. dynastic crisis
    A dynastic crisis is a period of political instability triggered by disputed succession, extinction, or fragmentation of a ruling family’s line, often leading to conflict over legitimate authority.
  • E. revolutionary theory
    Revolutionary theory is a conceptual framework that analyzes the conditions, processes, and strategies through which fundamental social, political, or economic transformations occur or can be brought about.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76f0b93c48190a117319ab3a9f282 completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:21 p.m.