Triple

T38089296
Position Surface form Disambiguated ID Type / Status
Subject Salute E951065 entity
Predicate soundFilmStatus P25500 FINISHED
Object early part-talkie era film LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: early part-talkie era film | Statement: [Salute, soundFilmStatus, early part-talkie era film]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: soundFilmStatus
Context triple: [Salute, soundFilmStatus, early part-talkie era film]
  • A. filmStatus
    Indicates the current production, release, or availability state of a film (e.g., announced, in production, released, cancelled).
  • B. soundFilm chosen
    Indicates that a film includes synchronized recorded sound, such as dialogue, music, or effects, rather than being silent.
  • C. isSoundFilm
    Indicates that a film includes synchronized recorded sound as an integral part of its presentation, rather than being a silent film.
  • D. hasFilmVersionStatus
    Indicates whether and how a work has been adapted into a film, specifying the status of that film version.
  • E. statusDuringFilm
    Indicates that a particular status or condition holds for an entity during the time span in which a specified film takes place or is being made.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76f03a3608190a73fd6df87c792a8 completed May 3, 2026, 3:51 p.m.
NER Named-entity recognition batch_69fc4748843c8190931432653be4890c completed May 7, 2026, 8:03 a.m.
PD Predicate disambiguation batch_69fc45646ce481908caf292ff9f06e15 completed May 7, 2026, 7:55 a.m.
Created at: May 3, 2026, 4:21 p.m.