Triple

T3808701
Position Surface form Disambiguated ID Type / Status
Subject Rim Fire 2013 (affected area) E93074 entity
Predicate hydrologicalImpactOn P13099 FINISHED
Object Tuolumne River watershed E25560 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tuolumne River watershed | Statement: [Rim Fire 2013 (affected area), hydrologicalImpactOn, Tuolumne River watershed]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tuolumne River watershed
Context triple: [Rim Fire 2013 (affected area), hydrologicalImpactOn, Tuolumne River watershed]
  • A. Kaweah River watershed
    The Kaweah River watershed is a mountainous drainage basin in California’s southern Sierra Nevada that channels snowmelt and rainfall through steep canyons and forests before flowing into the San Joaquin Valley.
  • B. Tuolumne River chosen
    The Tuolumne River is a major Sierra Nevada waterway in California known for its scenic alpine meadows, deep granite canyons, and popular whitewater rafting and fishing opportunities.
  • C. Sonoma Creek watershed
    The Sonoma Creek watershed is a drainage basin in Sonoma County, California, that collects runoff from the Mayacamas Mountains and surrounding landscapes before flowing into San Pablo Bay.
  • D. San Joaquin River Basin
    The San Joaquin River Basin is a major watershed in California’s Central Valley that drains the San Joaquin River and its tributaries, supporting extensive agriculture, ecosystems, and communities.
  • E. Ventura River watershed
    The Ventura River watershed is a river basin in Ventura County, California, that collects runoff from surrounding mountain ranges and drains it through the Ventura River to the Pacific Ocean.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hydrologicalImpactOn
Context triple: [Rim Fire 2013 (affected area), hydrologicalImpactOn, Tuolumne River watershed]
  • A. hydrologicalProcess chosen
    Indicates a relationship where an entity participates in, is affected by, or is otherwise involved in the movement, distribution, or transformation of water within the hydrological cycle.
  • B. hydrology
    Indicates the relationship between entities and the movement, distribution, or properties of water within natural or engineered environments.
  • C. impactOfDrainage
    Indicates the effect or consequences that a drainage system or drainage activity has on a particular target or environment.
  • D. hydrologicalCharacteristic
    Indicates a relationship where a hydrological feature or condition (such as water flow, level, or behavior) characterizes or describes another entity.
  • E. hydrologicallyModifiedAs
    Indicates that one water-related feature has been altered, influenced, or reshaped by another through hydrological processes or human water-management activities.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed96a60088190ab1df8390fffc935 completed March 9, 2026, 2:30 p.m.
NER Named-entity recognition batch_69aef1515c688190a38332aedeed8a76 completed March 9, 2026, 4:12 p.m.
NED1 Entity disambiguation (via context triple) batch_69b4fb30a61c819096325d7f11d22f89 completed March 14, 2026, 6:07 a.m.
PD Predicate disambiguation batch_69aee7482d708190a3ec74745b102a4c completed March 9, 2026, 3:29 p.m.
Created at: March 9, 2026, 3:16 p.m.