Triple

T38077035
Position Surface form Disambiguated ID Type / Status
Subject 京都駅ビル E950743 entity
Predicate instanceOf P0 FINISHED
Object 駅ビル C63042 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 駅ビル
Context triple: [京都駅ビル, instanceOf, 駅ビル]
  • A. Mori Building
    Mori Building is a conceptual class representing a large-scale urban development entity that plans, constructs, owns, and manages high-rise buildings and mixed-use complexes within metropolitan environments.
  • B. Tobu Railway station
    A Tobu Railway station is a passenger rail facility operated by the private Japanese company Tobu Railway, serving as a stop for its regional and commuter train services.
  • C. Sapporo Municipal Subway station
    A Sapporo Municipal Subway station is a transit facility within Sapporo’s urban rail network that provides platforms, access, and services for boarding, alighting, and transferring between subway trains and other modes of transportation.
  • D. Keihan Electric Railway station
    A Keihan Electric Railway station is a passenger facility along the Keihan Electric Railway network in Japan where trains stop to allow boarding, alighting, and transfers between services.
  • E. Yokohama Municipal Subway station
    A Yokohama Municipal Subway station is a public transit facility within Yokohama’s subway network where passengers access, board, and transfer between municipal subway trains and related services.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76f02a6c48190a94f3c0b3ee90cf2 completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:21 p.m.