Triple

T3801795
Position Surface form Disambiguated ID Type / Status
Subject Rothesay Pavilion E91704 entity
Predicate instanceOf P0 FINISHED
Object Modernist architecture C6817 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Modernist architecture
Context triple: [Rothesay Pavilion, instanceOf, Modernist architecture]
  • A. modernist architecture movement
    The modernist architecture movement is a 20th-century design approach that emphasizes functional forms, minimal ornamentation, and the honest expression of materials and structure in response to industrialization and new technologies.
  • B. modernist architectural work chosen
    A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
  • C. modernist architecture work
    A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
  • D. postmodern architecture
    Postmodern architecture is a design movement that emerged in the late 20th century, characterized by eclectic forms, playful references to historical styles, and a rejection of the strict functionalism and minimalism of modernism.
  • E. modernisme building
    A modernisme building is an early 20th-century architectural structure characterized by organic forms, rich ornamentation, innovative use of materials, and a synthesis of arts and crafts, particularly associated with Catalan Modernism.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed96354f48190a768966d6bd19b04 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:15 p.m.