Triple

T37983655
Position Surface form Disambiguated ID Type / Status
Subject Wynyard Walk pedestrian tunnel E947625 entity
Predicate instanceOf P0 FINISHED
Object underground walkway C4955 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: underground walkway
Context triple: [Wynyard Walk pedestrian tunnel, instanceOf, underground walkway]
  • A. covered walkway
    A covered walkway is a roofed passage that provides sheltered pedestrian movement between locations, protecting users from weather while guiding circulation.
  • B. underground structure chosen
    An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
  • C. underground metro station
    An underground metro station is a subterranean transit facility where passengers access, board, and disembark metro trains via platforms connected to the surface by tunnels, stairs, escalators, and elevators.
  • D. elevated walkway
    An elevated walkway is a raised pedestrian pathway, typically supported above ground level, that allows people to move safely and efficiently over obstacles, traffic, or uneven terrain.
  • E. roadway underpass
    A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ef8a1d08190a741bbbc5970e3b3 completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:20 p.m.