Triple

T37937833
Position Surface form Disambiguated ID Type / Status
Subject Lesotho Highlands E946396 entity
Predicate sourceOf P409 FINISHED
Object Malibamatso River
The Malibamatso River is a major river in Lesotho that flows through the highlands and feeds into the Katse Dam, one of Africa’s highest and most significant water-storage reservoirs.
E2288177 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Malibamatso River | Statement: [Lesotho Highlands, sourceOf, Malibamatso River]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Malibamatso River
Triple: [Lesotho Highlands, sourceOf, Malibamatso River]
Generated description
The Malibamatso River is a major river in Lesotho that flows through the highlands and feeds into the Katse Dam, one of Africa’s highest and most significant water-storage reservoirs.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ef531ac8190ae6d99e5786e76ec completed May 3, 2026, 3:51 p.m.
NER Named-entity recognition batch_69fbbd9d4dd48190ac1e1c080dbdd72a completed May 6, 2026, 10:15 p.m.
NED1 Entity disambiguation (via context triple) batch_6a5a6c1f6840819097298b881abd7fb6 completed July 17, 2026, 5:53 p.m.
NEDg Description generation batch_6a5a6cb83b1481908367cc9831344089 completed July 17, 2026, 5:56 p.m.
NED2 Entity disambiguation (via description) batch_6a5a6f4097288190ad444adefc46996c completed July 17, 2026, 6:06 p.m.
Created at: May 3, 2026, 4:20 p.m.